Transport of a bridge
In winter 2010 Silvasti transported smaller sections of a bridge from Ruukki, Ylivieska, to workshop in the Port of Rahja.
The transport chain included transports from door to door.
In winter 2010 Silvasti transported smaller sections of a bridge from Ruukki, Ylivieska, to workshop in the Port of Rahja. Max dimensions of these transports were about 30,0 x 6,0 x 4,0 m. Between the winter of 2010 and the summer of 2010 the customer welded smaller sections together in the port area.
In the end there were five pieces of a bridge to be transported to their final site in the Southern Finland.
In September 2010 Silvasti loaded five sections to two barges. The biggest sections were 114,0 x 11,0 x 4,0 m and 240 tons.