2011

Winter transports in Härnösand

Windpower Logistics

2011 Silvasti finished wind turbine project in Härnösand, Sweden. During this project winter became to Härnösand. There was a 18 % slope and the total weight was 100 tons. Last transports were done with the help of two big wheel loaders.